Our Road Department is getting ready for our Spring road work. As funds are available, listed below is the road maintenance schedule for this year.
Chip and Seal:
- Congress Lake, Waterloo Road to Randolph Road, 1.6 miles
- Trares Road, Congress Lake Road to Conley Road, 1.3 miles
- Fairlane Estates, Sunline Drive, Whitehall Drive & Galaxy Drive, 1.1 miles
- Kehner Road, entire length, 1.0 miles
- East Swartz Road, entire length, .3 miles
- Martin Road, State Route 224 to Bolender Road, 1.4 miles
- Weakland Road, entire length, .3 miles
- Inglewood Drive, Heartwood Drive, Sweetbriar Drive, Nestledown Drive, 1.0 miles
- Spring Valley, Vesper Drive, Pheasant Drive, .75 miles